The Painting Professionals

About us
The Estimating Process
The Painting Process
Virtual Online Estimate
Penthouse Paint Pics
Painting Pics
Decorative Paint Pics
Commercial Paint Pics
Wallpaper Pics
Home Renovation Slide 1
Home Renovation Slide 2
Kitchen Reno Slide 1
Tiling Slide
Wood Flooring Pics
Temporary Walls
Scissor Lift Video
License and Insurance
Testimonials
Color Design & Calculator
Our Warranty
Contact Us
Employment Opportunities
Links
Apartment Renovation Pictures- Condo # 1594
 
This two bedroom condo took Pro Paint Squad (PPS) under 3 weeks to complete and also required us to be the general contractor for this project. 
This project required us to remove the wall between the kitchen and living room to create an open kitchen - living room space.
Being creative, we designed and custom-built a small dining counter. 
We had the kitchen cabinets and counters custom-built and installed.
Kitchen floor tiles and backsplash were installed (backsplash not installed when the picture was taken)
All new floor and wall tiles were installed in the bathroom (picture not available)
We primed and painted walls, as well as the ceilings. 
We installed chair rails throughout the foyer and living room. 
Refinished all the wood floors throughout the apartment. 
 
 
Condo # 1594
Pause Stop Previous Next View full-sized photos

 

                                                                                            

 in Real Time, 24 hours a day, 7 days a week.